Currently doing the room assessment for the CTS 3000. The room is new designed and equipped only for the CTS 3000 system. There is a light and sound measurement. AC is needed for the whole room, because the three plasma displays and the code will produce a lot of heat. The whole system need about 8000 Wats. Here is a first picture of the room for the CTS 3000. We will start to assemble a 1000 and a 3000 system tomorrow. The 1000 should take about 1 day, but the 3000 will be about 3-5 workdays. We will do that in a team with cisco together.
7. März 2007
Keine Kommentare »
No comments yet.
RSS feed for comments on this post. TrackBack URL